Recent Jobs
200+ ceiling jobs completed across Kitchener-Waterloo, Cambridge, Guelph and beyond.
41 jobs shown
West End, Guelph
N1H · Ben T. · May 26, 2026
Guelph West End — master suite and two kids rooms stripped clean.
Kortright Hills, Guelph
N1G · Xavier P. · May 22, 2026
Guelph Kortright Hills — whole house done over one long weekend.
Downtown Guelph, Guelph
N1E · Tina L. · Apr 8, 2026
Guelph Downtown — crown moulding reinstalled, ceiling gap patched.
South End, Guelph
N1G · Pam H. · Jan 13, 2026
Guelph South End — ceiling replaced after dishwasher line burst.
West End, Guelph
N1H · Laura D. · Oct 20, 2025
Guelph West End — chimney removal left rough ceiling, patched smooth.
Pineridge-Westminster Woods, Guelph
N1L · Hope Z. · Jul 27, 2025
Guelph Pineridge — dishwasher hose burst, ceiling below rebuilt.
Exhibition Park, Guelph
N1H · Dana V. · May 3, 2025
Guelph Exhibition Park — settlement crack along ceiling beam.
Kortright Hills, Guelph
N1G · Zara R. · Feb 7, 2025
Guelph Kortright Hills — slow drip from skylight, fully repaired.
South End, Guelph
N1G · Val N. · Nov 13, 2024
Guelph South End — skylight frame cracked, patched and sealed.
West End, Guelph
N1H · Ron J. · Aug 20, 2024
Guelph West End — flood damage, ceiling replaced in 3 rooms.
Exhibition Park, Guelph
N1H · Mike E. · May 6, 2024
Guelph Exhibition Park — full main floor and master suite.
Kortright Hills, Guelph
N1G · Greg Y. · Dec 30, 2023
Guelph Kortright Hills — all ceilings painted post-skim.
Pineridge-Westminster Woods, Guelph
N1L · Cal U. · Oct 6, 2023
Guelph Pineridge — all bedrooms plus hallway, 2-day job.
Downtown Guelph, Guelph
N1E · Yara Q. · Jul 13, 2023
Guelph Downtown — heritage rough plaster skim coated smooth.
West End, Guelph
N1H · Uma M. · Apr 19, 2023
Guelph West End — repaint after smooth ceiling installed.
South End, Guelph
N1G · Omar G. · Dec 13, 2022
Guelph South End — pot light holes patched after rewire.
Exhibition Park, Guelph
N1H · Greg Y. · Dec 19, 2020
Full house — 6 rooms stripped, skim coated, ready for paint.
Downtown Guelph, Guelph
N1E · Faye X. · Nov 28, 2020
Popcorn removed by owner, we skim coated and finished smooth.
Pineridge-Westminster Woods, Guelph
N1L · Ed W. · Nov 7, 2020
Roof flashing issue caused slow leak — drywall replaced and finished.
Kortright Hills, Guelph
N1G · Dee V. · Oct 16, 2020
Kortright Hills — master and en suite, smooth finish with skim.
West End, Guelph
N1H · Cal U. · Sep 25, 2020
Ceilings repainted in flat white after full kitchen renovation.
South End, Guelph
N1G · Ben T. · Sep 4, 2020
All bedrooms and hallway — 3 rooms done in one day.
Exhibition Park, Guelph
N1H · Ann S. · Aug 14, 2020
Exhibition Park home — popcorn removed and smooth finish applied.
Pineridge-Westminster Woods, Guelph
N1L · Zane R. · Jul 23, 2020
Pot light cut wrong — ceiling hole repaired and finished.
Downtown Guelph, Guelph
N1E · Yara Q. · Jul 2, 2020
Downtown loft conversion — industrial popcorn removed, smooth.
West End, Guelph
N1H · Xavier P. · Jun 11, 2020
Bathroom exhaust fan had no duct — moisture damage repaired.
Kortright Hills, Guelph
N1G · Wendy O. · May 21, 2020
Post-removal repaint — two colours, white field and greige tray.
South End, Guelph
N1G · Vince N. · Apr 29, 2020
Oil-paint popcorn — wet strip method used throughout.
Exhibition Park, Guelph
N1H · Uma M. · Apr 8, 2020
Exhibition Park 1960s semi — stipple skim coated to smooth.
Pineridge-Westminster Woods, Guelph
N1L · Tara L. · Mar 18, 2020
Pineridge bungalow — main floor popcorn, one day in and out.
West End, Guelph
N1H · Steve K. · Feb 26, 2020
Wet drywall from roof ice dam — section replaced and blended.
Downtown Guelph, Guelph
N1E · Rose J. · Feb 4, 2020
Full house — popcorn in every room removed and skimmed flat.
Kortright Hills, Guelph
N1G · Quinn I. · Jan 14, 2020
Ceilings painted after skim coat — used low-sheen for no glare.
South End, Guelph
N1G · Paul H. · Dec 24, 2019
Entire main floor of 1970s bungalow — stripped and smooth.
West End, Guelph
N1H · Ora G. · Dec 2, 2019
West End house with badly applied 1980s texture skim coated smooth.
Exhibition Park, Guelph
N1H · Noah F. · Nov 11, 2019
Flooding from above — ceiling removed, dried, rebuilt and painted.
Kortright Hills, Guelph
N1G · Maya E. · Oct 21, 2019
Kortright Hills family home — full main floor and master bedroom.
Pineridge-Westminster Woods, Guelph
N1L · Liam D. · Sep 30, 2019
Pineridge semi — ceiling crack along beam fixed and painted.
Downtown Guelph, Guelph
N1E · Kate C. · Sep 8, 2019
Downtown Guelph heritage home, careful removal around plaster detail.
West End, Guelph
N1H · James B. · Aug 18, 2019
Bright white repaint on smooth ceilings, entire home.
South End, Guelph
N1G · Ivy A. · Jul 28, 2019
South End new-build oddly had popcorn — removed for resale value.