Recent Jobs
200+ ceiling jobs completed across Kitchener-Waterloo, Cambridge, Guelph and beyond.
200 jobs shown
Andrew K.
Forest Heights, Kitchener · N2N
Full main floor popcorn removal and smooth finish in 1970s ranch home.
Jan 2024
Michelle T.
Stanley Park, Kitchener · N2A
Living room and hallway popcorn scraped, skim coated, and painted white.
Jan 2024
Jason M.
Downtown, Kitchener · N2G
Ceiling patch after bathroom exhaust fan replacement, textured to match.
Jan 2024
Sandra B.
Victoria Park, Kitchener · N2H
3-bedroom bungalow, all ceilings stripped and re-textured flat.
Jan 2024
David R.
Doon, Kitchener · N2P
Two coats premium white on freshly skimmed ceilings throughout main floor.
Feb 2024
Karen L.
Country Hills, Kitchener · N2E
Ceiling collapsed from upstairs leak — demo, drywall, skim, paint.
Feb 2024
Tom W.
Lackner Woods, Kitchener · N2A
Master bedroom and en suite, latex-painted popcorn removed safely.
Feb 2024
Lisa F.
Forest Hill, Kitchener · N2M
Orange peel texture skim coated smooth on vaulted ceiling.
Feb 2024
Brian S.
Alpine Village, Kitchener · N2E
Full condo unit — living, dining, 2 beds — all ceilings done in 2 days.
Mar 2024
Nancy P.
Rosenberg, Kitchener · N2R
Large crack along ceiling joist, taped, filled, painted.
Mar 2024
Gary H.
Huron Park, Kitchener · N2R
Entire upper floor — 4 rooms stripped and skimmed over 3 days.
Mar 2024
Diane C.
Westmount, Kitchener · N2M
Repaint of smooth ceilings after renovation, walls masked and protected.
Mar 2024
Paul N.
Stanley Park, Kitchener · N2A
Roof leak caused staining and soft drywall — replaced section and painted.
Apr 2024
Carol V.
Forest Heights, Kitchener · N2N
Pre-sale prep — full house popcorn removal and smooth finish.
Apr 2024
Ray J.
Doon, Kitchener · N2P
Doorbell installer punched through ceiling — clean patch and match.
Apr 2024
Heather Z.
Victoria Park, Kitchener · N2H
Open-concept main floor scraped and skim coated, ready for painting.
Apr 2024
Matt D.
Country Hills, Kitchener · N2E
Two rooms repainted white after water damage restoration.
May 2024
Joanne A.
Alpine Village, Kitchener · N2E
Heavily textured 1980s stipple skim coated to glass-smooth finish.
May 2024
Steve O.
Lackner Woods, Kitchener · N2A
Kitchen and breakfast nook popcorn removed, painted in 1 day.
May 2024
Fiona Q.
Huron Park, Kitchener · N2R
Dishwasher line burst — ceiling in kitchen below replaced and painted.
May 2024
Clive B.
Downtown, Kitchener · N2G
1960s bungalow, full main floor, asbestos-free tested prior.
Jun 2024
Pam E.
Forest Hill, Kitchener · N2M
Entire house ceilings repainted in BM Chantilly Lace.
Jun 2024
Dan G.
Rosenberg, Kitchener · N2R
Rental unit between tenants — popcorn off, smooth finish applied.
Jun 2024
Iris Y.
Stanley Park, Kitchener · N2A
Skylight surround cracked — repaired, mudded, sanded, painted.
Jun 2024
Bruce U.
Victoria Park, Kitchener · N2H
Primary and two kids rooms done while family was at the cottage.
Jul 2024
Nicole X.
Uptown, Waterloo · N2J
Living and dining ceilings stripped clean, skim coated flat.
Jan 2024
Ben C.
Westmount, Waterloo · N2L
Bathroom above soaked through — ceiling replaced and textured.
Jan 2024
Lynn H.
Eastbridge, Waterloo · N2K
Oil-based popcorn in 1975 split-level — tested, stripped, smooth finish.
Jan 2024
Alan R.
Laurelwood, Waterloo · N2V
All ceilings painted flat white after full house reno.
Feb 2024
Chloe M.
University District, Waterloo · N2L
University District condo, all rooms, 2-day job.
Feb 2024
Owen T.
Lincoln Heights, Waterloo · N2J
Pot light installation left rough holes — patched and smooth.
Feb 2024
Ruth S.
Columbia Hills, Waterloo · N2V
Columbia Hills semi — main floor and stairwell ceiling done.
Mar 2024
Frank I.
Beechwood, Waterloo · N2T
Stipple ceiling in rec room skim coated over two days.
Mar 2024
Mona J.
Beechwood, Waterloo · N2T
Beechwood townhouse — 3 floors stripped top to bottom.
Mar 2024
Sam K.
Westmount, Waterloo · N2L
Ice dam caused damage across kitchen ceiling — full repair.
Mar 2024
Tara L.
Uptown, Waterloo · N2J
Pre-purchase agreement condition — popcorn removed before close.
Apr 2024
Victor N.
Laurelwood, Waterloo · N2V
Flat ceiling painted after drywall repairs throughout house.
Apr 2024
Wendy O.
University District, Waterloo · N2L
University condo, main rooms, fast 1-day turnaround.
Apr 2024
Xander P.
Eastbridge, Waterloo · N2K
Water stain patched and blended with existing ceiling finish.
Apr 2024
Yvonne Q.
Lincoln Heights, Waterloo · N2J
Lincoln Heights bungalow — full house popcorn removal, 3 days.
May 2024
Zach R.
Columbia Hills, Waterloo · N2V
Basement ceiling scraped and painted to brighten rec room.
May 2024
Amy S.
Beechwood, Waterloo · N2T
New build ceiling painted — 3 coats for perfect coverage.
May 2024
Bob T.
Westmount, Waterloo · N2L
Rough drywall skim coated smooth in new-build primary suite.
May 2024
Clara U.
Uptown, Waterloo · N2J
Uptown heritage home — careful removal near ornate crown moulding.
Jun 2024
Derek V.
Laurelwood, Waterloo · N2V
Skylight seal failed — water damage repaired on vaulted ceiling.
Jun 2024
Eva W.
University District, Waterloo · N2L
Student rental property — all units refreshed between leases.
Jun 2024
Fred X.
Uptown, Waterloo · N2J
Ceiling medallion removed — hole patched and painted.
Jun 2024
Gail Y.
Eastbridge, Waterloo · N2K
Full house, 2-storey — popcorn off every room, smooth finish.
Jul 2024
Harry Z.
Lincoln Heights, Waterloo · N2J
Living room vaulted ceiling painted after scrape and skim.
Jul 2024
Isla A.
Columbia Hills, Waterloo · N2V
1978 Columbia Hills home — tested, removed, skim coated.
Jul 2024
Jack B.
Galt, Cambridge · N1R
Galt heritage semi — full ceiling removal, preserved original trim.
Jan 2024
Kim C.
Preston, Cambridge · N3H
Ceiling bubbling from roof — section replaced and painted.
Jan 2024
Leo D.
Hespeler, Cambridge · N3C
Hespeler bungalow — all main floor rooms done in one day.
Jan 2024
Meg E.
North Galt, Cambridge · N1S
Crack running from window header to ceiling corner — repaired.
Feb 2024
Nick F.
East Galt, Cambridge · N1R
East Galt 1960s home — tested clear, stripped smooth.
Feb 2024
Olivia G.
Westgate, Cambridge · N1T
Freshly skimmed ceilings painted — 2 coats contractor white.
Feb 2024
Pete H.
Blair, Cambridge · N3C
Blair area older home — popcorn removed, smooth ceiling.
Feb 2024
Quinn I.
Galt, Cambridge · N1R
Artex stipple on dining room ceiling skim coated flat.
Mar 2024
Rose J.
Preston, Cambridge · N3H
Preston townhouse, 3 rooms, popcorn off and smooth painted.
Mar 2024
Sean K.
Hespeler, Cambridge · N3C
Burst pipe upstairs — kitchen ceiling below demoed and rebuilt.
Mar 2024
Tina L.
North Galt, Cambridge · N1S
All bedrooms done while owners were away for spring break.
Mar 2024
Uriah M.
East Galt, Cambridge · N1R
Post-removal paint in satin white — 3 coats on plaster ceiling.
Apr 2024
Vera N.
Westgate, Cambridge · N1T
Westgate split-level — all ceilings over 3 days.
Apr 2024
Will O.
Galt, Cambridge · N1R
Settlement cracks in old Galt home — filled, sanded, painted.
Apr 2024
Xena P.
Blair, Cambridge · N3C
Pre-sale full house popcorn removal — clients moved within 30 days.
Apr 2024
Yolanda Q.
Preston, Cambridge · N3H
Preston bungalow — latex-painted popcorn handled with wet method.
May 2024
Zack R.
Hespeler, Cambridge · N3C
1970s stucco ceiling skim coated in open-concept living area.
May 2024
Alice S.
North Galt, Cambridge · N1S
Tenant reported dripping — source fixed, ceiling restored.
May 2024
Blake T.
Galt, Cambridge · N1R
Galt Victorian — careful removal of stipple near ornate coving.
May 2024
Casey U.
Westgate, Cambridge · N1T
Painted all ceilings in prep for sale listing the following week.
Jun 2024
Drew V.
East Galt, Cambridge · N1R
Full house — 5 rooms, popcorn removed and skimmed smooth.
Jun 2024
Elle W.
Preston, Cambridge · N3H
Television mount pulled out — anchor holes patched and painted.
Jun 2024
Finn X.
Hespeler, Cambridge · N3C
Master and two kids rooms stripped over a weekend.
Jun 2024
Gwen Y.
Blair, Cambridge · N3C
Entire bungalow in 2 days — dustless process, minimal disruption.
Jul 2024
Hugh Z.
North Galt, Cambridge · N1S
Skylight leaked for years — new section installed, finished smooth.
Jul 2024
Ivy A.
South End, Guelph · N1G
South End new-build oddly had popcorn — removed for resale value.
Jan 2024
James B.
West End, Guelph · N1H
Bright white repaint on smooth ceilings, entire home.
Jan 2024
Kate C.
Downtown Guelph, Guelph · N1E
Downtown Guelph heritage home, careful removal around plaster detail.
Jan 2024
Liam D.
Pineridge-Westminster Woods, Guelph · N1L
Pineridge semi — ceiling crack along beam fixed and painted.
Feb 2024
Maya E.
Kortright Hills, Guelph · N1G
Kortright Hills family home — full main floor and master bedroom.
Feb 2024
Noah F.
Exhibition Park, Guelph · N1H
Flooding from above — ceiling removed, dried, rebuilt and painted.
Feb 2024
Ora G.
West End, Guelph · N1H
West End house with badly applied 1980s texture skim coated smooth.
Mar 2024
Paul H.
South End, Guelph · N1G
Entire main floor of 1970s bungalow — stripped and smooth.
Mar 2024
Quinn I.
Kortright Hills, Guelph · N1G
Ceilings painted after skim coat — used low-sheen for no glare.
Mar 2024
Rose J.
Downtown Guelph, Guelph · N1E
Full house — popcorn in every room removed and skimmed flat.
Mar 2024
Steve K.
West End, Guelph · N1H
Wet drywall from roof ice dam — section replaced and blended.
Apr 2024
Tara L.
Pineridge-Westminster Woods, Guelph · N1L
Pineridge bungalow — main floor popcorn, one day in and out.
Apr 2024
Uma M.
Exhibition Park, Guelph · N1H
Exhibition Park 1960s semi — stipple skim coated to smooth.
Apr 2024
Vince N.
South End, Guelph · N1G
Oil-paint popcorn — wet strip method used throughout.
Apr 2024
Wendy O.
Kortright Hills, Guelph · N1G
Post-removal repaint — two colours, white field and greige tray.
May 2024
Xavier P.
West End, Guelph · N1H
Bathroom exhaust fan had no duct — moisture damage repaired.
May 2024
Yara Q.
Downtown Guelph, Guelph · N1E
Downtown loft conversion — industrial popcorn removed, smooth.
May 2024
Zane R.
Pineridge-Westminster Woods, Guelph · N1L
Pot light cut wrong — ceiling hole repaired and finished.
May 2024
Ann S.
Exhibition Park, Guelph · N1H
Exhibition Park home — popcorn removed and smooth finish applied.
Jun 2024
Ben T.
South End, Guelph · N1G
All bedrooms and hallway — 3 rooms done in one day.
Jun 2024
Cal U.
West End, Guelph · N1H
Ceilings repainted in flat white after full kitchen renovation.
Jun 2024
Dee V.
Kortright Hills, Guelph · N1G
Kortright Hills — master and en suite, smooth finish with skim.
Jun 2024
Ed W.
Pineridge-Westminster Woods, Guelph · N1L
Roof flashing issue caused slow leak — drywall replaced and finished.
Jul 2024
Faye X.
Downtown Guelph, Guelph · N1E
Popcorn removed by owner, we skim coated and finished smooth.
Jul 2024
Greg Y.
Exhibition Park, Guelph · N1H
Full house — 6 rooms stripped, skim coated, ready for paint.
Jul 2024
Helen Z.
Elmira, Woolwich · N3B
Elmira farmhouse — original plaster with popcorn applied on top, removed carefully.
Aug 2024
Ian A.
St. Jacobs, Woolwich · N0B
St. Jacobs heritage barn conversion — ceiling crack patched.
Aug 2024
Jane B.
Breslau, Woolwich · N0B
Breslau new-builds — popcorn applied by builder, removed on request.
Aug 2024
Ken C.
Elmira, Woolwich · N3B
Entire main floor painted after popcorn removal in Elmira semi.
Aug 2024
Lara D.
Conestogo, Woolwich · N0B
Conestogo cottage ceiling — leak from second floor bath repaired.
Sep 2024
Mike E.
Bloomingdale, Woolwich · N0B
Bloomingdale farmhouse — entire main floor over two days.
Sep 2024
Nell F.
North Woolwich, Woolwich · N0B
North Woolwich cottage — stipple skim coated in living room.
Sep 2024
Otto G.
New Hamburg, Wilmot · N3A
New Hamburg century home — popcorn removed, exposed original plaster.
Aug 2024
Petra H.
Baden, Wilmot · N3A
Baden semi — ceiling patched after pot light additions.
Aug 2024
Quinn I.
New Dundee, Wilmot · N0B
New Dundee farmhouse — one large open-concept space, done in 4 hours.
Aug 2024
Ron J.
New Hamburg, Wilmot · N3A
Post-removal paint in New Hamburg — all rooms, 2 coats.
Aug 2024
Sue K.
Mannheim, Wilmot · N0B
Mannheim home — ice damming caused ceiling section to fail.
Sep 2024
Tim L.
Wellesley, Wellesley · N0B
Wellesley village home — main floor popcorn removed and smooth finish.
Aug 2024
Una M.
St. Clements, Wellesley · N0B
St. Clements farmhouse — large ceiling crack repaired and blended.
Aug 2024
Val N.
Linwood, Wellesley · N0B
Linwood bungalow — oil-based popcorn stripped using wet method.
Aug 2024
Walt O.
Ayr, North Dumfries · N0B
Ayr heritage home — popcorn on original lath and plaster, handled carefully.
Aug 2024
Xena P.
Roseville, North Dumfries · N0B
Roseville farmhouse — roof section blown off, ceiling rebuilt.
Aug 2024
Yolanda Q.
Ayr, North Dumfries · N0B
Ayr bungalow — ceilings repainted after full renovation.
Aug 2024
Zara R.
Downtown Woodstock, Woodstock · N4S
Downtown Woodstock apartment — all rooms done in one day.
Sep 2024
Adam S.
Woodstock North, Woodstock · N4T
Woodstock North — ceiling repair after electrical upgrade.
Sep 2024
Beth T.
Pittock, Woodstock · N4S
Pittock family home — 1970s popcorn removed throughout.
Sep 2024
Cole U.
Woodstock East, Woodstock · N4V
East Woodstock — bright white repaint on all main floor ceilings.
Sep 2024
Dana V.
Old East Woodstock, Woodstock · N4S
Old East Woodstock — slow drip from upstairs bath repaired.
Oct 2024
Evan W.
Woodstock West, Woodstock · N4T
West Woodstock split-level — entire house done over a weekend.
Oct 2024
Fern X.
Downtown Brantford, Brantford · N3T
Downtown Brantford century home — plaster prep, careful popcorn removal.
Sep 2024
Gus Y.
North Ward, Brantford · N3R
North Ward — plumbing rough-in cut through ceiling, patched.
Sep 2024
Hope Z.
West Brant, Brantford · N3P
West Brant home — 3-bed, main floor ceilings stripped and skimmed.
Sep 2024
Ivan A.
Eagle Place, Brantford · N3S
Eagle Place heritage home — ceilings repainted in 3 rooms.
Sep 2024
Jade B.
Henderson Survey, Brantford · N3R
Henderson Survey — ice damming caused damage across main ceiling.
Oct 2024
Karl C.
Mayfair, Brantford · N3R
Mayfair bungalow — full house, oil-based popcorn removed.
Oct 2024
Laura D.
Forest Heights, Kitchener · N2N
Forest Heights family home — popcorn removed from all 4 bedrooms.
Oct 2024
Mark E.
Uptown, Waterloo · N2J
Waterloo condo — fresh white coat post-removal throughout.
Oct 2024
Nina F.
Galt, Cambridge · N1R
Cambridge Galt pre-sale — full main floor popcorn removed.
Oct 2024
Omar G.
South End, Guelph · N1G
Guelph South End — pot light holes patched after rewire.
Oct 2024
Pam H.
Westmount, Waterloo · N2L
Waterloo Westmount — master and guest rooms done.
Oct 2024
Quinn I.
Stanley Park, Kitchener · N2A
Kitchener Stanley Park — stipple removed and skim coated.
Oct 2024
Rachel J.
Preston, Cambridge · N3H
Cambridge Preston — slow leak from ice dam fixed and refinished.
Oct 2024
Sam K.
Country Hills, Kitchener · N2E
Kitchener Country Hills — living and dining done in 6 hours.
Nov 2024
Tina L.
Eastbridge, Waterloo · N2K
Waterloo Eastbridge — 1980s semi, full main floor.
Nov 2024
Uma M.
West End, Guelph · N1H
Guelph West End — repaint after smooth ceiling installed.
Nov 2024
Victor N.
Doon, Kitchener · N2P
Kitchener Doon — main floor and basement rec room scraped.
Nov 2024
Wanda O.
Columbia Hills, Waterloo · N2V
Waterloo Columbia Hills — damaged section after water intrusion.
Nov 2024
Xavier P.
Hespeler, Cambridge · N3C
Cambridge Hespeler — 1970s bungalow fully stripped and skimmed.
Nov 2024
Yara Q.
Downtown Guelph, Guelph · N1E
Guelph Downtown — heritage rough plaster skim coated smooth.
Nov 2024
Zach R.
Huron Park, Kitchener · N2R
Kitchener Huron Park — rental unit between tenants, 1 day.
Nov 2024
Amy S.
Laurelwood, Waterloo · N2V
Waterloo Laurelwood — 3 rooms repainted in flat ceiling white.
Nov 2024
Ben T.
Westgate, Cambridge · N1T
Cambridge Westgate — bathroom drain overflow, ceiling fully repaired.
Nov 2024
Cal U.
Pineridge-Westminster Woods, Guelph · N1L
Guelph Pineridge — all bedrooms plus hallway, 2-day job.
Nov 2024
Dee V.
Victoria Park, Kitchener · N2H
Kitchener Victoria Park — full 2-storey home, 3 days total.
Dec 2024
Ed W.
Beechwood, Waterloo · N2T
Waterloo Beechwood — hairline cracks after foundation shift repaired.
Dec 2024
Faye X.
North Galt, Cambridge · N1S
Cambridge North Galt — full house popcorn off, ready for paint.
Dec 2024
Greg Y.
Kortright Hills, Guelph · N1G
Guelph Kortright Hills — all ceilings painted post-skim.
Dec 2024
Helen Z.
Alpine Village, Kitchener · N2E
Kitchener Alpine Village — full main floor removed and skimmed.
Dec 2024
Ian A.
University District, Waterloo · N2L
Waterloo University District — rental unit refreshed between tenants.
Dec 2024
Jane B.
Blair, Cambridge · N3C
Cambridge Blair — pipe freeze caused ceiling rupture, rebuilt.
Dec 2024
Ken C.
Forest Hill, Kitchener · N2M
Kitchener Forest Hill — 1970s home, all ceilings done over 2 days.
Jan 2025
Lara D.
Lincoln Heights, Waterloo · N2J
Waterloo Lincoln Heights — ceilings painted after popcorn removal.
Jan 2025
Mike E.
Exhibition Park, Guelph · N1H
Guelph Exhibition Park — full main floor and master suite.
Jan 2025
Nell F.
East Galt, Cambridge · N1R
Cambridge East Galt — water stain repaired and ceiling blended.
Jan 2025
Otto G.
Rosenberg, Kitchener · N2R
Kitchener Rosenberg — townhouse, all 3 floors scraped and skimmed.
Jan 2025
Petra H.
Uptown, Waterloo · N2J
Waterloo Uptown — heritage double, all rooms done in 2 days.
Jan 2025
Quinn I.
Galt, Cambridge · N1R
Cambridge Galt Victorian — horsehair plaster skim coated.
Jan 2025
Ron J.
West End, Guelph · N1H
Guelph West End — flood damage, ceiling replaced in 3 rooms.
Feb 2025
Sue K.
Lackner Woods, Kitchener · N2A
Kitchener Lackner Woods — full house prep before listing.
Feb 2025
Tim L.
Eastbridge, Waterloo · N2K
Waterloo Eastbridge — freshly skimmed ceilings painted flat white.
Feb 2025
Una M.
Preston, Cambridge · N3H
Cambridge Preston — full bungalow done while owners were away.
Feb 2025
Val N.
South End, Guelph · N1G
Guelph South End — skylight frame cracked, patched and sealed.
Feb 2025
Walt O.
Downtown, Kitchener · N2G
Kitchener Downtown — 1960s condo, all rooms stripped and skimmed.
Feb 2025
Xena P.
Westmount, Waterloo · N2L
Waterloo Westmount — basement rec room scrape and skim coat.
Feb 2025
Yolanda Q.
Hespeler, Cambridge · N3C
Cambridge Hespeler — living room stucco skim coated smooth.
Mar 2025
Zara R.
Kortright Hills, Guelph · N1G
Guelph Kortright Hills — slow drip from skylight, fully repaired.
Mar 2025
Adam S.
Huron Park, Kitchener · N2R
Kitchener Huron Park — oil-based popcorn, wet strip method used.
Mar 2025
Beth T.
Columbia Hills, Waterloo · N2V
Waterloo Columbia Hills — 4 rooms repainted after full reno.
Mar 2025
Cole U.
Westgate, Cambridge · N1T
Cambridge Westgate — entire main floor done in one day.
Mar 2025
Dana V.
Exhibition Park, Guelph · N1H
Guelph Exhibition Park — settlement crack along ceiling beam.
Mar 2025
Evan W.
Forest Heights, Kitchener · N2N
Kitchener Forest Heights — 2-storey home, all ceilings stripped.
Mar 2025
Fern X.
Laurelwood, Waterloo · N2V
Waterloo Laurelwood — 4 bedrooms and hallway done in 2 days.
Mar 2025
Gus Y.
Blair, Cambridge · N3C
Cambridge Blair — old stipple skim coated in all main floor rooms.
Mar 2025
Hope Z.
Pineridge-Westminster Woods, Guelph · N1L
Guelph Pineridge — dishwasher hose burst, ceiling below rebuilt.
Apr 2025
Ivan A.
Victoria Park, Kitchener · N2H
Kitchener Victoria Park — pre-sale prep, smooth finish throughout.
Apr 2025
Jade B.
Beechwood, Waterloo · N2T
Waterloo Beechwood — post-skim repaint, all main floor rooms.
Apr 2025
Karl C.
North Galt, Cambridge · N1S
Cambridge North Galt — rental property refreshed between tenants.
Apr 2025
Laura D.
West End, Guelph · N1H
Guelph West End — chimney removal left rough ceiling, patched smooth.
Apr 2025
Mark E.
Doon, Kitchener · N2P
Kitchener Doon — full house, oil-based popcorn, 2 days.
Apr 2025
Nina F.
Uptown, Waterloo · N2J
Waterloo Uptown — apartment building unit skim coated throughout.
Apr 2025
Omar G.
East Galt, Cambridge · N1R
Cambridge East Galt — living and dining room done in 4 hours.
Apr 2025
Pam H.
South End, Guelph · N1G
Guelph South End — ceiling replaced after dishwasher line burst.
Apr 2025
Quinn I.
Stanley Park, Kitchener · N2A
Kitchener Stanley Park — 3-bed bungalow done before listing.
May 2025
Rachel J.
Lincoln Heights, Waterloo · N2J
Waterloo Lincoln Heights — ceiling painted same day as skim.
May 2025
Sam K.
Galt, Cambridge · N1R
Cambridge Galt — 1950s bungalow, everything stripped smooth.
May 2025
Tina L.
Downtown Guelph, Guelph · N1E
Guelph Downtown — crown moulding reinstalled, ceiling gap patched.
May 2025
Uma M.
Country Hills, Kitchener · N2E
Kitchener Country Hills — full house popcorn off and skimmed.
May 2025
Victor N.
Beechwood, Waterloo · N2T
Waterloo Beechwood — all main floor ceilings skim coated.
May 2025
Wanda O.
Hespeler, Cambridge · N3C
Cambridge Hespeler — roof valley leak, section rebuilt and finished.
May 2025
Xavier P.
Kortright Hills, Guelph · N1G
Guelph Kortright Hills — whole house done over one long weekend.
May 2025
Yara Q.
Rosenberg, Kitchener · N2R
Kitchener Rosenberg — 4 rooms painted in flat white after skim.
Jun 2025
Zach R.
Eastbridge, Waterloo · N2K
Waterloo Eastbridge — pre-sale, full house stripped in 2 days.
Jun 2025
Amy S.
Preston, Cambridge · N3H
Cambridge Preston — access panel hole patched and blended smooth.
Jun 2025
Ben T.
West End, Guelph · N1H
Guelph West End — master suite and two kids rooms stripped clean.
Jun 2025
Cal U.
Forest Heights, Kitchener · N2N
Kitchener Forest Heights — final home of the season, smooth finish.
Jun 2025