How Messy Is Popcorn Ceiling Removal in Kitchener-Waterloo?

Home›Blog›Process
★
Google Reviewed
✓
Fully Insured
W
WSIB Covered
◎
100% Dustless
⚡
Instant Quote
✦
Satisfaction Guaranteed
ProcessNovember 6, 2026·25 min read·5,046 words
E

By Eddie— Owner & Lead Technician

500+ KW homes completed since 2019 · $2M liability insured · WSIB covered · Fully Ontario-certified for popcorn ceiling removal & asbestos coordination.

$2M InsuredWSIB Covered500+ Projects$2M Insured & WSIB

Published 2026-11-06. Popcorn ceiling removal is messy for a few hours at the start and a few hours at the end of the job, and almost entirely contained in between. It does not have to be messy in your house. Wet scraping, full plastic containment, floor protection and a HEPA vacuum on the sanders keep dust and debris in the room being worked on. This guide explains what actually happens in a home, why some removals go badly, what we do to prevent it, and what you can do to make the job easier on yourself. I'm Eddie, and I've been on every job since starting this business in 2019, with over 500 Kitchener-Waterloo homes completed.

If you're searching for "how messy is popcorn ceiling removal," you probably have one of two worries. Either you've heard that scraping a ceiling dumps white grit over everything you own, or you're comparing doing it yourself against hiring someone. Both worries are fair. The honest answer is that the mess depends almost entirely on method. Dry scraping with no prep is a disaster. A controlled, contained job is something most families live through without drama. You'll find more detail on method, cost and timing below, and our complete Ontario guide covers the wider picture.

The short answer: where the mess actually comes from

Three things make a removal messy: the scraped texture itself, the sanding dust from the skim coats that follow, and sloppy handling of both. Everything else is secondary.

  • Scraped texture. Popcorn texture is a spray-applied mix that is mostly drywall-type material and fibres. Scraped dry, it crumbles and floats. Scraped after the surface has been lightly misted, it comes off in heavy wet clumps that drop straight down onto sheeting. Same material, completely different mess.
  • Sanding dust. This is the one people forget. Once the texture is off, the ceiling needs skim coats of joint compound to get a flat finish, and sanding those coats makes fine white dust. That fine dust, not the scraped texture, is what travels into hallways and ductwork if the room isn't sealed.
  • Sloppy handling. Tape that peels, sheeting that isn't overlapped, a furnace running while the work is happening, boots walking debris from room to room. Almost every horror story I hear from homeowners who tried it themselves comes back to one of these.

A properly run job controls all three, so the practical answer to "how messy" is "contained." You will see disruption: plastic on the walls, furniture moved out or covered, work lights, some noise. You should not be finding white dust on your kitchen counters at the end of the week.

Why this matters in Kitchener-Waterloo right now

Our region has a lot of homes built when textured ceilings were the standard finish. Across Kitchener, Waterloo, Cambridge and Guelph, the 1970s through 1990s housing stock is full of sprayed popcorn and stipple ceilings. Many of those houses are now on their second or third owners, and the ceilings are 30 to 50 years old. They have yellowed, collected dust in the texture, picked up stains from old plumbing leaks, and in plenty of homes they have been painted over once or twice.

Three things are pushing homeowners to act:

  • Dated ceilings stand out in listing photos. A bright kitchen with a heavily textured ceiling above it looks unfinished next to newer renovations.
  • Lighting has changed. Pot lights and LED fixtures throw light across the ceiling at an angle, which makes every bump in the texture cast a shadow. Homeowners who add pot lights often discover how much they dislike the texture afterwards.
  • People are renovating in place. With move-up costs where they are, many families in Kitchener-Waterloo are updating the house they have, and the ceiling is one of the highest-impact, lowest-disruption changes available. If you are weighing the decision, our write-up on whether removal is worth it for a Kitchener-Waterloo homeowner goes into the reasoning.

One more local factor: because so much of our housing was built before 1990, asbestos testing is a normal early step here rather than an exception. It affects how messy and how regulated the job is, so I cover it in detail below.

The full process: how we contain the mess, step by step

This is the order of work on a typical job. Not every home needs every step, but the logic is the same each time. I'll explain what happens and what you will notice as the homeowner.

Step 1: Assessment and ceiling identification

Before anything is scheduled, I look at the ceilings. The key questions are whether the texture is unpainted, latex-painted or oil-base painted (that changes how the texture comes off and how it is priced), what condition the drywall underneath is in, how high the ceilings are, and when the house was built. Painted popcorn is harder and slower to remove because the paint seals the texture and keeps it from absorbing water, so it scrapes less cleanly. That affects both labour and mess, which is why the rates differ.

If the home was built before 1990, I recommend testing a sample before any removal work starts. More on that below.

Step 2: Prep the house

Rooms are cleared as much as possible. Anything that stays is wrapped in plastic. Then comes the protection:

  • Floors: Hard-wearing floor protection is laid down first, with seams overlapped and taped so debris can't work underneath. Hardwood and laminate get proper covering, not just a thin drop cloth.
  • Walls and trim: Plastic is hung from the ceiling line down the walls where needed, sealed at the edges.
  • Doorways and openings: Doorways to the rest of the house are sealed with plastic sheeting. If there's a doorway you need to use, we set up a zipper entry so people can move in and out without opening the whole barrier.
  • Vents and returns: Supply vents and cold-air returns in the work area are covered, and I ask that the furnace fan isn't running through the work zone during sanding. Dust drawn into ductwork is the version of this mess that spreads to rooms we never touched.
  • Light fixtures and fans: Anything attached to the ceiling is either removed or sealed.

Prep takes time, and it is the single biggest reason a professional job stays clean. Skipping prep to save an hour is how rooms get ruined.

Step 3: Wet scraping the texture

The texture is lightly misted so the material softens and absorbs water, then scraped off in sections. Wetting keeps most of it from becoming airborne. What falls lands as damp clumps on the floor protection rather than as a cloud. For painted ceilings, where water can't soak in the same way, the work is slower and more careful, and more of the effort goes into cleaning up the debris as we go.

The texture is collected as it comes down, bagged, and carried out. It does not get left sitting in piles overnight.

Step 4: Skim coating

Once the texture is gone, the ceiling is rarely perfectly flat. Old drywall tape lines, nail pops, small gouges from scraping and the leftover roughness of the texture all show up. Two skim coats of joint compound level that out. Each coat needs time to dry before the next one goes on, which is a big part of why a proper job takes at least two days. Rushing the drying is how you get cracking and visible lines later.

Step 5: Dust-controlled sanding

This is the dustiest stage, so it gets the most control. Sanding is done with equipment that connects to a HEPA vacuum so most of the dust is captured at the source rather than released into the room. Where the situation calls for it, we add an air scrubber or negative air setup that pulls air through a HEPA filter and holds the work area at slightly lower pressure than the rest of the house, so air leaks inward rather than outward. Combined with sealed doorways and covered vents, that is what keeps fine dust out of your bedrooms and kitchen.

Step 6: Cleanup, primer and paint

When sanding finishes, surfaces are vacuumed and wiped before any primer goes on. Primer seals the compound, and two coats of Sherwin-Williams paint finish the ceiling. Containment comes down at the end, with the plastic folded in on itself so whatever settled on it stays inside it. Cleanup is done at the end of each work day as well as at the end of the job, so you aren't living in a progressively worse mess for three days.

As Tobi Asekunowo put it in her review, "They were professional, careful in the home, and the finished result was excellent." Being careful in the home is what the prep and containment steps above are for.

What you will notice living through it

Here is the honest list, because pretending there is no disruption does nobody any favours.

  • Plastic and protection in the work area for the length of the job.
  • Noise from scraping, sanding and the vacuum or air scrubber.
  • A mild damp smell from joint compound while it dries.
  • Furniture in other rooms if you've had to relocate things from the work zone.
  • Limited access to the rooms being worked on. A kitchen ceiling job, for example, means planning around meals for a couple of days.

Most families stay in the house. If you have a newborn, anyone with serious respiratory conditions, or pets that are sensitive, it's worth planning to stay elsewhere for the sanding stage. Tell me up front and we can plan around it.

Pricing breakdown

All per-square-foot rates below are before HST. "All-inclusive" describes what the work covers (removal, two skim coats, primer and two coats of Sherwin-Williams paint). It does not mean tax is included, and HST of 13% is added to the quote.

ServiceRate (plus HST)What it covers
Popcorn removal, unpainted ceiling$4.50/sqftRemoval, 2 skim coats, primer, 2 coats Sherwin-Williams paint
Popcorn removal, latex-painted ceiling$6.50/sqftSame scope, slower removal because paint seals the texture
Popcorn removal, oil-base painted ceiling$7.50/sqftSame scope, the most labour-intensive removal
Skim coat only (smooth ceiling, nothing to bury)$2.50/sqftSkim coating only
Skim coat only, full-service with protection$3.50/sqftSkim coating with floor and room protection
Skim coat over existing texture$8.50/sqftTexture stays, 3 coats to bury it
Ceiling painting only$50 to $400 per roomPainting an already-smooth ceiling
Asbestos testing$300 to $500Lab testing at cost, no markup

Two points on that table. First, the skim-over-texture option costs more than removal, not less. It takes three coats to bury a texture that deep, and you end up with a thicker, heavier ceiling and the texture still sitting under it. I don't recommend it unless there's a specific reason removal isn't possible. Second, I quote a 300 square foot minimum, so a single small bedroom is billed as a 300 square foot job.

For a deeper cost breakdown, see our full 2026 pricing guide for Kitchener-Waterloo.

A worked example with HST

Take a 500 square foot job, such as a main floor with a couple of rooms or a condo, on an unpainted ceiling. 500 sqft x $4.50 = $2,250. HST at 13% is $292.50. The total is $2,542.50. The same 500 square feet on a latex-painted ceiling is 500 x $6.50 = $3,250 before HST, and on an oil-base painted ceiling it is 500 x $7.50 = $3,750 before HST.

Room-by-room cost table

The totals below are square footage multiplied by the rate for that ceiling type, before HST. Square footages are ceiling areas that I use as planning figures, so your own numbers will differ once I measure. A whole three-bedroom house of ceilings is usually 900 to 1,500 square feet, which is $4,050 to $1,250 before HST depending on ceiling type (900 x $4.50 at the low end, 1,500 x $7.50 at the high end).

ScenarioCeiling areaUnpainted ($4.50)Latex-painted ($6.50)Oil-base painted ($7.50)
One small bedroom (about 150 sqft, billed at the 300 sqft minimum)300 sqft];,350];,950$2,250
Living room and dining room400 sqft];,800$2,600$3,000
Main floor with a couple of rooms500 sqft$2,250$3,250$3,750
Condo600 sqft$2,700$3,900$4,500
Basement (finished ceilings)800 sqft$3,600$5,200$6,000
Whole house, smaller900 sqft$4,050$5,850$6,750
Whole house, mid-size1,200 sqft$5,400$7,800$9,000
Whole house, larger1,500 sqft$6,750$9,750$1,250

So a typical 400 to 600 square foot job lands between ];,800 (400 sqft, unpainted) and $4,500 (600 sqft, oil-base painted), plus HST. Most of the jobs I quote in that range sit in the lower half of it, because most ceilings in the region are unpainted or latex-painted.

Basements deserve a note. A basement ceiling often has ductwork, plumbing and bulkheads to work around, and the work area is usually more enclosed. Containment is easier in one sense, since there's a floor above and walls around, but dust has fewer places to go and ventilation needs more thought.

Factors that affect price

  • Ceiling type. Unpainted, latex-painted and oil-base painted are priced differently because the work is different. If you don't know which you have, tell me and I'll check it at the visit.
  • Square footage. It drives the whole quote. Bulkheads, openings and odd shapes change the billable area.
  • Age and condition of the home. Older drywall with loose tape, water stains or previous patching takes more prep and repair.
  • Ceiling height. Vaulted or tall ceilings need staging and add time.
  • Number of rooms. More rooms means more setup and more containment, though the per-square-foot work gets more efficient as the job grows.
  • Asbestos result. A positive result changes what is allowed and who can do the work.
  • Extras. Wall painting, trim, repairs unrelated to the ceiling. Tanya Fleet's job, for instance, included painting the entire interior as well as removing the popcorn ceilings in all of her rooms.

On volume: a bigger job is more efficient per square foot because setup happens once and the crew flows from room to room. The per-square-foot rate in the table stays the same, so the savings come from doing it all in one visit rather than splitting it into multiple smaller bookings that each need their own setup.

Asbestos: when to worry, what testing involves

This is the most important section for anyone with an older home. Spray-applied textured ceilings in some homes contained asbestos, particularly in houses built before the mid-1980s, although homes built into the early 1990s can still have older material or older stock. My rule is simple: I treat any ceiling in a pre-1990 home as untested until a lab says otherwise.

What testing involves

A small sample of the texture is collected carefully, with the area misted so no dust is released, and sealed and sent to an accredited lab. The lab analyzes it and reports whether asbestos is present. Testing costs $300 to $500, and we pass that along at cost with no markup. Results usually take a few business days, so I recommend testing before you book your removal date.

Why you should not skip it

Asbestos is dangerous when fibres are released into the air and inhaled. Scraping and sanding a ceiling that contains it can do exactly that. That's why I won't start scraping a pre-1990 ceiling without a result in hand. A negative result means the work goes ahead as normal. A positive result changes everything.

What happens if asbestos is found

The work is no longer a regular ceiling removal. Under Ontario's asbestos rules, the way the material may be handled depends on the type of work and how likely it is to release fibres, and it can require specific procedures, worker training and containment far beyond what a standard job uses. In that case I'll explain your options plainly: arrange abatement by a qualified asbestos contractor first, then bring us in for the skim coating, priming and painting afterwards, or leave the ceiling alone and paint it where it is. Disturbing it yourself is not an option I'd ever suggest.

Ontario regulations deep dive

I'm a ceiling contractor, not a lawyer, so treat this section as a plain-language orientation and confirm specifics with the Ontario Ministry of Labour or the relevant authority for your situation. These are the pieces that come up most often.

Ontario Regulation 278/05: asbestos on construction projects

Reg 278/05 is Ontario's asbestos regulation for construction projects and building repair operations. It sets out how asbestos-containing material must be handled depending on the kind of work being done, including precautions, worker training and notification requirements for higher-risk work. The point for homeowners is that if your ceiling tests positive, there are legal requirements on how the work is done, and a contractor who ignores them puts you and their workers at risk.

O. Reg 490/09: designated substances

O. Reg 490/09 covers designated substances under the Occupational Health and Safety Act, and asbestos is one of them. Owners and constructors are expected to know about designated substances on a project and share that information with the contractors doing the work. That is part of why a lab result matters: it is the information everyone on the job needs before work begins.

WSIB requirements

In Ontario, construction contractors are generally required to carry WSIB coverage. If a contractor without coverage has a worker injured in your home, the question of who is responsible can land on the homeowner. We carry full WSIB coverage, and we also carry $2M commercial liability insurance. You should ask any contractor for proof of both before work starts, and a legitimate company will provide it without friction.

Asbestos disposal rules

Asbestos-containing waste can't go in regular household garbage or a standard dumpster. Ontario's waste rules require it to be wrapped, labelled and delivered to an approved facility. This is another reason a positive result moves the job into specialist territory, and another reason a cheap quote that doesn't mention testing or disposal should make you cautious.

Landlord and condo obligations

If you rent out the property, tenants have entry notice rights under Ontario's residential tenancy rules, and you are responsible for sharing known information about hazardous materials and managing work safely around occupied units. If you own a condo, check your corporation's rules first. Many condo buildings require advance notice, approved work hours, elevator bookings and proof of insurance from contractors, and some have their own records about materials in the building. Contact your property manager before you book any work.

DIY versus professional: honest comparison

I understand the instinct to do this yourself. It looks like scraping, and scraping looks easy. Here's how it compares in practice.

FactorDIYProfessional
MessHigh if prep is thin; fine dust spreads easilyContained with sealed sheeting, HEPA sanding and daily cleanup
Asbestos safetyEasy to forget or underestimate; you carry the riskTesting built into the process for older homes
Finish qualitySkim coating and sanding is a skill; lines and ridges are commonSmooth, paint-ready finish
TimeOften several weekendsTypically 2 to 3 days for most homes; 3 to 5 for larger homes
ToolsScrapers, sprayer, plastic, tape, stilts or staging, sanders, vacuum, respirator, primer, paintIncluded
CostMaterials and rentals, plus your time$4.50 to $7.50/sqft plus HST for removal, skim, primer and paint
WarrantyNoneOne year workmanship warranty

The hidden costs of DIY

  • Equipment. Proper respirators, floor protection, a sander that connects to a vacuum, work lights, staging. These add up quickly if you don't own them.
  • Cleanup time. A first-time job often spends as much time cleaning as scraping.
  • Repairs. Gouges from a scraper that dug into the drywall paper need patching before skim coating.
  • Redoing it. A skim coat that shows ridges under paint is a very common DIY result, and fixing it means more sanding, more mess and more repainting.
  • Testing. Skipping it on an older home is the most expensive shortcut of all.

If you are handy, patient and your home is verified asbestos-free, DIY is possible. Be realistic about the finish, though, and expect the mess to be the larger half of the job.

Realistic timeline: a day-by-day breakdown

The minimum job is two days, because the skim coats need drying time and I won't rush them. Here is how a typical 400 to 600 square foot job, such as a main floor or a condo, runs. Larger homes take 3 to 5 days because there's more area to cover at every stage.

  1. Before the job: assessment and testing. I measure, identify the ceiling type, and look at the drywall condition. If the home is pre-1990, a sample goes to the lab and we wait for the result before booking removal. Quote and scope are confirmed in writing.
  2. Day 1: prep, containment, removal and first skim. Furniture is moved or wrapped, floors and walls are protected, vents are covered, doorways are sealed. The texture is wet scraped and bagged out, and the first skim coat goes on. Cleanup happens at the end of the day.
  3. Day 2: second skim coat and sanding. Once the first coat has dried, the second goes on. When that has dried, sanding happens with HEPA-connected equipment, with air scrubbing where needed. Surfaces are wiped down for primer.
  4. Day 3 (when the job needs it): primer, paint and walkthrough. Primer and two coats of paint go on. On smaller jobs the final coats can be tight inside day 2 and the last stage completes on the following visit, depending on drying conditions. We take down the containment, do a final cleanup, and I walk through the finished ceilings with you under the room's normal lighting so you can check them.

Humidity and weather matter. Compound dries slower in a damp week, and I would rather add half a day than paint over something that isn't ready.

Prep checklist for homeowners

  • Clear as much furniture, décor and small items from the work area as you can.
  • Take pictures off the walls and remove curtains and blinds that are close to the ceiling.
  • Empty closets in the affected rooms or cover everything inside them.
  • Move electronics, plants and anything fragile to another room.
  • Plan where pets will stay for the sanding stage.
  • Turn off or plan around the furnace fan and any ceiling-mounted air handling in the work zone.
  • Give clear parking and access, and let your condo or building manager know the dates if you live in a managed building.
  • If your home was built before 1990, have the asbestos sample result in hand before the job date.
  • Decide on the paint colour in advance if you want something other than white.

How to choose a contractor

Questions I would ask if I were hiring this work:

  • Do you test for asbestos in older homes before you start, and what do you do with a positive result?
  • How do you contain dust? Ask specifically about sheeting, floor protection and HEPA sanding.
  • Can you provide proof of WSIB coverage and liability insurance?
  • Is the quote per square foot, and what exactly is included in that rate?
  • Who will be on site? Is it the person quoting the work or a subcontractor you've never met?
  • What warranty do you give, and in writing?

Red flags include a quote with no square footage, a price that sounds far below everyone else's, a company that won't discuss asbestos, no insurance paperwork, and any promise to finish in under two days. A properly skimmed ceiling needs drying time. For a longer comparison, see our guide to choosing the best popcorn ceiling removal company in Kitchener-Waterloo.

A real quote lists the ceiling type, the area, the rate, what's included (removal, two skim coats, primer, two coats of paint), HST shown separately, and the plan for testing if the house is older. If those are missing, ask for them.

ROI and resale value

I won't give you a made-up percentage return, because there isn't a reliable one for ceilings alone. What I can tell you is how it works in practice. Buyers walking through a home notice ceilings, even when they can't say why a room feels dated. A smooth, bright ceiling makes rooms look larger and cleaner, and photographs far better in listings. It also removes an objection: buyers in an older home often assume that popcorn means asbestos, dust and a project waiting for them. A clean, finished ceiling takes that off the table.

The payback is also in the years you live there. A 500 square foot main floor at $2,250 before HST (unpainted) costs less than many kitchen appliances, and it changes how every room on that floor looks and how your light fixtures perform. If you're planning to sell within a year or two, ceilings are one of the more sensible things to do before listing, since it's a contained job that needs only a few days. Akinwole Akintunde described the result this way: "The room instantly looked brighter and more updated."

Neighbourhood spotlight: Kitchener-Waterloo and Cambridge

These are general patterns I see by area. Individual homes vary, so I always check the ceiling itself rather than assume.

  • Forest Heights (Kitchener): Largely a 1960s through 1980s neighbourhood of detached homes and townhouses. Textured ceilings are common, and pre-1990 testing applies.
  • Stanley Park (Kitchener): Established homes with a mix of eras. Many have had interior updates over the years, so I often find painted texture, which affects the rate.
  • Pioneer Park (Kitchener): Mostly 1970s and 1980s housing near the Grand River. Sprayed ceilings are common in these homes.
  • Chicopee and Centreville (Kitchener): Family neighbourhoods with homes from several decades. Older ones need testing, and newer ones are worth confirming rather than assuming.
  • Victoria Hills (Kitchener): A mix of apartments, townhouses and detached homes, where building rules and condo-style access can apply.
  • Bridgeport (Kitchener): An older part of the city with a wide range of building ages, including homes that have had multiple renovations.
  • Grand River South (Kitchener): Newer construction in general. Textured ceilings are less likely here, but they do show up, and a quick check is easy.
  • Doon (Kitchener): A mix of older and newer homes. I tell homeowners to look at their own house's age, not the area's, when deciding on testing.

The same patterns show up in Waterloo, Cambridge and Guelph. If you want to see how we work in specific cities, take a look at our pages on popcorn ceiling removal in Kitchener and the Waterloo service area. We also work across Cambridge, Guelph, Brantford, Woodstock, Hamilton, Burlington, Milton and Oakville.

Why KW Popcorn Ceiling Removal and Painting

  • Eddie on every job. I'm the one who quotes, and I'm the one on site. Owner-operated since 2019.
  • Over 500 Kitchener-Waterloo homes completed since 2019.
  • $2M commercial liability insurance and full WSIB coverage.
  • A clear process. Testing for older homes, full containment, two skim coats, primer and two coats of Sherwin-Williams paint.
  • A one year workmanship warranty.
  • Local. We know the housing stock. That's the reason we work locally rather than sending out-of-region crews and GTA-based contractors who don't know how these homes were built.

Gary Hines wrote: "He worked clean with the best of outcomes." That is what I aim for on every job, and it is the answer to the question this post started with.

For a complete rundown of the process from start to finish, see our long-form 2026 guide to popcorn ceiling removal in Kitchener-Waterloo.

Frequently asked questions

How messy is popcorn ceiling removal in a lived-in home?

With full containment, it is disruptive but controlled. Plastic covers the floors, walls and doorways of the work area, the texture is wet scraped so it drops instead of floating, and sanding is done with HEPA-connected equipment. Expect plastic, noise and limited access to the work area, not dust throughout the house.

Do I need to move out during the work?

Most families stay. If anyone has serious breathing problems, or you have an infant, it is worth staying elsewhere during sanding. Tell me when you book and we'll plan around it.

Does dust get into the rest of the house?

It shouldn't. Sealed doorways, covered vents, HEPA sanding and, where needed, negative air keep fine dust where it belongs. Keeping the furnace fan off through the work area is part of that.

How long does it take?

The minimum is two days because skim coats need drying time. Typical jobs run 2 to 3 days, and larger homes 3 to 5 days.

How much does it cost?

Unpainted ceilings are $4.50 per square foot, latex-painted are $6.50 and oil-base painted are $7.50, all plus HST. That covers removal, two skim coats, primer and two coats of paint. A 500 square foot unpainted job is $2,250 before HST and $2,542.50 with it.

Do I need asbestos testing?

If your home was built before 1990, yes, I recommend it before any removal. Testing costs $300 to $500, at cost with no markup.

Is skim coating over the texture cheaper than removal?

No. Burying the texture takes three coats and costs $8.50 per square foot, compared with $4.50 to $7.50 for removal. It also leaves the texture in place.

Can I just paint over popcorn ceiling?

You can, and painting alone is $50 to $400 per room. It does not remove the texture, though, and it makes future removal harder and more expensive, because painted texture is priced at the higher rates.

Is there a warranty?

Yes, a one year workmanship warranty.

What areas do you serve?

Kitchener, Waterloo, Cambridge, Guelph, Brantford, Woodstock, Hamilton, Burlington, Milton and Oakville.

Get a free local quote

If you'd like to know exactly what your ceilings involve, call me directly at (519) 729-7394. I'll ask about the age of the house, whether the ceilings have ever been painted, and roughly how many square feet you're covering, then give you a straight number with HST shown separately. If you prefer, you can send a few photos of your ceilings and I'll tell you what I see. Either way, the quote is free, and you'll talk to the person who will be on the job. Call (519) 729-7394 to book your visit.

E

Eddie — Owner, KW Popcorn Ceiling Removal & Painting

Eddie has personally completed 500+ ceiling removal projects across Kitchener, Waterloo, Cambridge, and Guelph since 2019. Fully licensed, $2M liability insured, and WSIB covered on every job in Ontario.

Ready for a smooth ceiling?

Free quotes for Kitchener-Waterloo, Cambridge, and Guelph homeowners.

Ready for a smooth ceiling?

Free, no-obligation quote. Most delivered same day.

(519) 729-7394
⚡ Instant Quote📞 Call Now