FAQ

Home›FAQ›How long does ceiling removal take for a...

How long does ceiling removal take for a Uptown home?

Most Uptown Waterloo homes take 2 to 3 days for a main floor or condo, and 4 to 6 days for a full house. Our price covers removal, two skim coats, primer and two coats of paint. The drying time between coats is what stretches the schedule.

  • Main floor, a few rooms, or a condo (400 to 600 sqft): $2,000 to $4,500.
  • Unpainted popcorn ceiling: $4.50/sqft all-inclusive. Latex-painted: $6.50/sqft. Oil-base painted: $7.50/sqft.

A full 3-bedroom home with 900 to 1,500 sqft of ceiling runs $4,050 to $11,250.

If your home was built before the mid-1980s, the texture may contain chrysotile asbestos. Ontario Regulation 278/05 requires testing before suspect material is disturbed. We coordinate testing at cost, $300 to $500 with no markup. Allow a few extra days for lab results before work starts. Removal itself is not required by law, and the Ontario Building Code does not regulate popcorn ceilings.

We are insured for $2M and WSIB covered. For a firm timeline on your Uptown home, call Eddie at (519) 729-7394. KW Popcorn Ceiling Removal · Waterloo service area · Google Reviews

Answered by Eddie · KW Popcorn Ceiling Removal & Painting · 500+ Ontario homes since 2019

Updated 2026-11-05

★
Google Reviewed
✓
Fully Insured
W
WSIB Covered
◎
100% Dustless
⚡
Instant Quote
✦
Satisfaction Guaranteed

Ready for a smooth ceiling?

Free, no-obligation quote. Most delivered same day.

(519) 729-7394
⚡ Instant Quote📞 Call Now