FAQ

Home›FAQ›How long does ceiling removal take for a...

How long does ceiling removal take for a Limehouse home?

Most Limehouse homes take 3 to 5 days for ceiling removal, and a main floor or condo-sized job often finishes in 2 to 3. The timeline depends on ceiling area and what is on the ceiling, not on the neighbourhood.

  • Main floor, a few rooms, or a condo (400-600 sqft): about 2-3 days, typically $2,000-$4,500.
  • Full home (900-1,500 sqft of ceiling): about 4-5 days, typically $4,050-$11,250.
  • Painted ceilings: latex ($6.50/sqft) and oil-base ($7.50/sqft) take longer than unpainted ($4.50/sqft), because the paint layer slows scraping.

The price includes removal, 2 skim coats, primer and 2 coats of paint. Skim coats need drying time between coats, which is most of the schedule.

Asbestos testing comes first. Chrysotile asbestos was mixed into ceiling texture through the 1970s and into the mid-1980s. Many older homes around Limehouse could be affected. Under Ontario Regulation 278/05, suspect material must be tested before it is disturbed. We coordinate testing at cost, $300-$500 with no markup, and results usually take a few days. If it comes back positive, the project timeline changes.

We are WSIB covered and carry $2M in liability insurance. Call Eddie at (519) 729-7394 for a firm schedule for your home. KW Popcorn Ceiling Removal · Halton Hills service area · Google Reviews

Answered by Eddie · KW Popcorn Ceiling Removal & Painting · 500+ Ontario homes since 2019

Updated 2026-11-19

★
Google Reviewed
✓
Fully Insured
W
WSIB Covered
◎
100% Dustless
⚡
Instant Quote
✦
Satisfaction Guaranteed

Ready for a smooth ceiling?

Free, no-obligation quote. Most delivered same day.

(519) 729-7394
⚡ Instant Quote📞 Call Now