FAQ

Home›FAQ›How long does ceiling removal take for a...

How long does ceiling removal take for a Innerkip home?

Most Innerkip homes take 3 to 5 working days for ceiling removal, start to finish. That covers scraping, two skim coats, primer and two coats of paint, with drying time between each stage.

  • Main floor, a few rooms, or a condo (400–600 sqft): usually 2 to 3 days. Pricing runs $2,000–$4,500.
  • Full home (900–1,500 sqft of ceiling): usually 4 to 5 days. At $4.50/sqft for unpainted ceilings, that is $4,050–$6,750, and painted ceilings run $6.50–$7.50/sqft.

Painted popcorn is slower because the paint has to be handled differently before it comes off. Pricing is all-inclusive: removal, 2 skim coats, primer and 2 coats of paint.

If your Innerkip home was built before the mid-1980s, the texture may contain chrysotile asbestos. Under Ontario Regulation 278/05, testing is required before disturbing suspect material. We coordinate testing at cost, $300–$500, with no markup. Lab results usually add a few days before work starts, so book testing early.

We are insured for $2M and WSIB covered, and have completed 500+ homes since 2019. Call Eddie at (519) 729-7394 for a firm timeline on your home. KW Popcorn Ceiling Removal · Google Reviews

Answered by Eddie · KW Popcorn Ceiling Removal & Painting · 500+ Ontario homes since 2019

Updated 2026-11-10

★
Google Reviewed
✓
Fully Insured
W
WSIB Covered
◎
100% Dustless
⚡
Instant Quote
✦
Satisfaction Guaranteed

Ready for a smooth ceiling?

Free, no-obligation quote. Most delivered same day.

(519) 729-7394
⚡ Instant Quote📞 Call Now