Most Huron South ceiling removal projects take 2 to 4 days of work on site, depending on the size of the home and the condition of the ceilings. A main floor, a few rooms, or a condo (roughly 400–600 sqft) usually wraps up in 2 to 3 days. A full 3-bedroom home with 900–1,500 sqft of ceiling typically takes 3 to 4 days.

The time comes from the full process, which is included in our all-inclusive per-sqft price:

  • Removal: scraping and cleanup, about a day
  • Two skim coats: each needs drying time between coats
  • Primer and two coats of paint: the final stage

Asbestos testing comes first for older homes. Chrysotile asbestos was mixed into ceiling texture through the 1970s and into the mid-1980s. Many Huron South homes were built later, but if yours is pre-1980 or you're unsure, test before anything is disturbed. Ontario Regulation 278/05 requires testing before disturbing suspect material. Removal itself isn't required by law, and the Ontario Building Code does not regulate popcorn ceilings. We coordinate testing at cost, $300–$500 with no markup, and results usually take a few days, so book it early.

Pricing: $4.50/sqft for unpainted popcorn, $6.50/sqft for latex-painted, and $7.50/sqft for oil-base painted ceilings. A main floor or condo typically runs $2,000–$4,500. A full 3-bedroom home runs $4,050–$11,250.

Call Eddie at (519) 729-7394 for a free quote and a firm schedule. We're WSIB covered and $2M insured, with 500+ homes completed since 2019. KW Popcorn Ceiling Removal · Google Reviews

Answered by Eddie · KW Popcorn Ceiling Removal & Painting · 500+ Ontario homes since 2019

Updated 2026-11-04

★
Google Reviewed
✓
Fully Insured
W
WSIB Covered
◎
100% Dustless
⚡
Instant Quote
✦
Satisfaction Guaranteed

Ready for a smooth ceiling?

Free, no-obligation quote. Most delivered same day.

(519) 729-7394
⚡ Instant Quote📞 Call Now