FAQ

Home›FAQ›How long does ceiling removal take for a...

How long does ceiling removal take for a Forest Hill home?

Most Forest Hill ceiling removal jobs take 2 to 4 days from start to finish, depending on the size of the home and the type of ceiling. Here is how it breaks down:

  • Main floor, a few rooms, or a condo (400-600 sqft): usually 2 to 3 days. Budget $2,000-$4,500.
  • Full 3-bedroom home (900-1,500 sqft of ceiling): usually 3 to 5 days. Budget $4,050-$11,250.

The timeline covers scraping, two skim coats with drying time between them, primer, and two coats of paint. Painted ceilings (latex at $6.50/sqft, oil-base at $7.50/sqft) take a little longer than unpainted ones ($4.50/sqft), since they are harder to scrape.

Asbestos testing comes first for older homes. Chrysotile asbestos was mixed into ceiling texture through the 1970s and into the mid-1980s. Many Forest Hill homes were built in that period, so testing is a smart first step. Under Ontario Regulation 278/05, testing is required before disturbing suspect material. We coordinate testing at cost ($300-$500, no markup). Results usually take a few days, so book testing early.

We are WSIB covered and carry $2M insurance. Call Eddie at (519) 729-7394 for a free quote and a firm schedule. KW Popcorn Ceiling Removal · Kitchener service area · Google Reviews

Answered by Eddie · KW Popcorn Ceiling Removal & Painting · 500+ Ontario homes since 2019

Updated 2026-11-12

★
Google Reviewed
✓
Fully Insured
W
WSIB Covered
◎
100% Dustless
⚡
Instant Quote
✦
Satisfaction Guaranteed

Ready for a smooth ceiling?

Free, no-obligation quote. Most delivered same day.

(519) 729-7394
⚡ Instant Quote📞 Call Now