FAQ

Home›FAQ›How long does ceiling removal take for a...

How long does ceiling removal take for a Forest Heights home?

Most Forest Heights homes take 3 to 5 working days from start to finish, depending on ceiling size and whether it is painted or unpainted. We have done 500+ homes since 2019, and Forest Heights bungalows and two-storeys follow the same pattern.

  • Main floor, a few rooms, or a condo (400-600 sqft): about 2 to 3 days. Pricing runs $2,000-$4,500.
  • Full 3-bedroom home (900-1,500 sqft of ceiling): about 4 to 5 days, $4,050-$11,250 all-inclusive.

Our rates are all-inclusive: $4.50/sqft unpainted, $6.50/sqft latex-painted, $7.50/sqft oil-base painted. That covers removal, 2 skim coats, primer and 2 coats of paint. Drying time between coats is what takes the days, not the scraping.

If your home was built before the mid-1980s, test for asbestos first. Ontario Regulation 278/05 requires testing before disturbing suspect material. We coordinate testing at cost, $300-$500 with no markup, and results usually take a few days, so book it early. Removal itself is not required by law.

We are fully insured ($2M) and WSIB covered. Call Eddie at (519) 729-7394 for a free quote and a firm timeline. KW Popcorn Ceiling Removal · Kitchener service area · Google Reviews

Answered by Eddie · KW Popcorn Ceiling Removal & Painting · 500+ Ontario homes since 2019

Updated 2026-11-12

★
Google Reviewed
✓
Fully Insured
W
WSIB Covered
◎
100% Dustless
⚡
Instant Quote
✦
Satisfaction Guaranteed

Ready for a smooth ceiling?

Free, no-obligation quote. Most delivered same day.

(519) 729-7394
⚡ Instant Quote📞 Call Now