How long does ceiling removal take for a Erin Mills home?

Most Erin Mills homes take about 3 to 5 working days for ceiling removal and finishing. Smaller jobs, such as a main floor, a few rooms or a condo of 400–600 sqft, are often done in 2 to 3 days. A full home with 900–1,500 sqft of ceiling usually takes the longer end of that range.

  • Day 1: Prep, floor and furniture protection, then scraping the texture.
  • Days 2–3: Two skim coats, with drying and sanding between each.
  • Days 4–5: Primer and two coats of paint.

Asbestos testing comes first. Many Erin Mills homes were built in the 1970s and 1980s, and chrysotile asbestos was used in ceiling texture before the mid-1980s. Ontario Regulation 278/05 requires testing before suspect material is disturbed. Removal itself is not required by law, and the Ontario Building Code does not regulate popcorn ceilings. We coordinate testing at cost for $300–$500, and lab results usually add a few days before work begins.

Pricing is all-inclusive: $4.50/sqft for unpainted ceilings, $6.50/sqft for latex-painted and $7.50/sqft for oil-base painted. Main floor or condo jobs typically run $2,000–$4,500. A full 3-bedroom home runs $4,050–$11,250.

Call Eddie at (519) 729-7394 for a free quote and a firm schedule. We are fully insured and WSIB covered. KW Popcorn Ceiling Removal · Mississauga service area · Google Reviews

Answered by Eddie · KW Popcorn Ceiling Removal & Painting · 500+ Ontario homes since 2019

Updated 2026-11-13

★
Google Reviewed
✓
Fully Insured
W
WSIB Covered
◎
100% Dustless
⚡
Instant Quote
✦
Satisfaction Guaranteed

Ready for a smooth ceiling?

Free, no-obligation quote. Most delivered same day.

(519) 729-7394
⚡ Instant Quote📞 Call Now