How long does ceiling removal take for a Erbsville home?
Most Erbsville homes take 2 to 4 days for popcorn ceiling removal, start to finish. A main floor, a few rooms, or a condo (400–600 sqft) usually takes 2 to 3 days. A full 3-bedroom home with 900–1,500 sqft of ceiling typically takes 3 to 5 days, depending on layout and ceiling condition.
That timeline covers the full process: scraping, two skim coats with drying time between them, primer, and two coats of paint. Drying time between coats is what stretches the schedule, so we don't rush it.
- Asbestos testing first: Chrysotile asbestos was mixed into ceiling texture through the 1970s and into the mid-1980s. If your home is pre-1980 or built before the mid-1980s, Ontario Regulation 278/05 requires testing before the texture is disturbed. We coordinate testing at cost, $300–$500, with no markup. Results typically add a few days before work begins.
- Pricing: Unpainted ceilings are $4.50/sqft all-inclusive. Latex-painted ceilings are $6.50/sqft. Oil-base painted ceilings are $7.50/sqft.
Removal isn't required by law, and the Ontario Building Code doesn't regulate popcorn ceilings. For a firm timeline and quote, call Eddie at (519) 729-7394. KW Popcorn Ceiling Removal · Waterloo service area · Google Reviews
Answered by Eddie · KW Popcorn Ceiling Removal & Painting · 500+ Ontario homes since 2019
Updated 2026-11-04
Related Questions
How much does popcorn ceiling removal cost in West Willow Woods?
How much does popcorn ceiling removal cost in Old University?
How much does popcorn ceiling removal cost in University?
Should I test for asbestos before hiring a popcorn ceiling removal company in Guelph?
Do I need an asbestos test before popcorn ceiling removal in an older Georgetown home?