FAQ

Home›FAQ›How long does ceiling removal take for a...

How long does ceiling removal take for a Ennisclare Park home?

Most Ennisclare Park homes take about 2 to 4 days for ceiling removal, and a full 3-bedroom home typically takes 3 to 5 days. That includes scraping, two skim coats, primer and two coats of paint, with drying time between each step.

  • Main floor, a few rooms, or a condo (400–600 sqft): about 2–3 days.
  • Full 3-bedroom home (900–1,500 sqft of ceiling): about 3–5 days.
  • Asbestos testing: allow a few extra days for lab results before work begins.

Homes built before the mid-1980s may contain chrysotile asbestos in the ceiling texture. Under Ontario Regulation 278/05, testing is required before disturbing suspect material. Removal itself is not mandated by law, and the Ontario Building Code does not regulate popcorn ceilings. We coordinate testing at cost ($300–$500, no markup).

Pricing is all-inclusive: $4.50/sqft for unpainted popcorn, $6.50/sqft for latex-painted, and $7.50/sqft for oil-base painted. A full 3-bedroom home runs $4,050–$11,250. Smaller jobs such as a condo or a few rooms run $2,000–$4,500.

We're insured for $2M and WSIB covered, with 500+ homes completed since 2019. Call Eddie at (519) 729-7394 for a free quote and exact timeline. KW Popcorn Ceiling Removal · Oakville service area · Google Reviews

Answered by Eddie · KW Popcorn Ceiling Removal & Painting · 500+ Ontario homes since 2019

Updated 2026-11-13

★
Google Reviewed
✓
Fully Insured
W
WSIB Covered
◎
100% Dustless
⚡
Instant Quote
✦
Satisfaction Guaranteed

Ready for a smooth ceiling?

Free, no-obligation quote. Most delivered same day.

(519) 729-7394
⚡ Instant Quote📞 Call Now