FAQ

Home›FAQ›How long does ceiling removal take for a...

How long does ceiling removal take for a Centreville Chicopee home?

Most Centreville Chicopee homes take 2 to 3 days for a main floor or a few rooms, and 4 to 6 days for a full home. The work includes removal, two skim coats, primer and two coats of paint, with drying time between each step.

  • Main floor, a few rooms or a condo (400 to 600 sqft): about 2 to 3 days, typically $2,000 to $4,500.
  • Full 3-bedroom home (900 to 1,500 sqft of ceiling): about 4 to 6 days, typically $4,050 to $11,250.
  • Rates: $4.50/sqft unpainted, $6.50/sqft latex-painted, $7.50/sqft oil-base painted, all-inclusive.

Many Chicopee homes were built before the mid-1980s, when chrysotile asbestos was still mixed into ceiling texture. Under Ontario Regulation 278/05, testing is required before suspect material is disturbed. We coordinate testing at cost, $300 to $500 with no markup, and the lab results can add a few days before work starts. Removal itself is not required by law, and the Ontario Building Code does not regulate popcorn ceilings.

We are WSIB covered and carry $2M in insurance. Call Eddie at (519) 729-7394 for a firm schedule for your home. KW Popcorn Ceiling Removal · Kitchener service area · Google Reviews

Answered by Eddie · KW Popcorn Ceiling Removal & Painting · 500+ Ontario homes since 2019

Updated 2026-10-02

★
Google Reviewed
✓
Fully Insured
W
WSIB Covered
◎
100% Dustless
⚡
Instant Quote
✦
Satisfaction Guaranteed

Ready for a smooth ceiling?

Free, no-obligation quote. Most delivered same day.

(519) 729-7394
⚡ Instant Quote📞 Call Now