Published 2026-11-04. If you own an older home in Cambridge or Guelph and are asking what it takes to get rid of the popcorn ceiling, here is the short version. Expect a 2 to 3 day job for most homes, a price of $4.50 to $7.50 per square foot plus HST depending on whether the ceiling is painted, and an asbestos test of $300 to $500 before anyone scrapes a thing if your house was built before the early 1990s. The rest of this guide explains each of those numbers and what sits behind them.
I'm Eddie, and I run KW Popcorn Ceiling Removal & Painting. I'm on every job personally, and since 2019 we've completed over 500 KW homes. That includes plenty of Cambridge and Guelph work. This post is the version of the answer I give homeowners at the kitchen table, with the arithmetic shown so you can check my math against any quote you receive. For a broader overview of the whole province, our complete Ontario guide covers the fundamentals, and this article narrows it to the two cities people ask about most outside Kitchener and Waterloo.
One note on what you will not find here. I don't publish customers' street addresses or photos of their homes without their say, so I've kept this post to the process, the numbers and the things I look for on every ceiling. The one customer voice I do quote is a real review that's already public on our Google listing.
Why this matters now in Cambridge and Guelph
Cambridge and Guelph have a lot of houses built in the window when textured ceilings were standard. Much of the housing in both cities went up between the 1960s and the early 1990s, and a spray-on texture was the cheapest way to finish drywall without taping and sanding a smooth surface. That means a large share of homes in Galt, Preston, Hespeler, Blair and across Guelph's older subdivisions still have the original texture overhead, often under one or more coats of paint.
Three things are pushing homeowners to act now rather than in a few years.
- Buyers expect smooth ceilings. A textured ceiling photographs poorly and signals "dated" before anyone sees the kitchen. Sellers in this region increasingly deal with it before listing rather than negotiate around it.
- Lighting has changed. LED pot lights and bright wall washers throw raking light across the ceiling. Texture that was invisible under a single central fixture now casts a shadow on every bump.
- Awareness of asbestos is higher. More homeowners know that older texture can contain asbestos and want it tested properly instead of guessing. Doing the test first is the correct order of operations, and it's the part many people skip.
Distance matters too. GTA-based contractors regularly quote Cambridge and Guelph jobs but price in travel, and out-of-region companies often can't return quickly if a touch-up is needed. We work out of Kitchener-Waterloo, so Cambridge is a short drive and Guelph is close behind. That keeps scheduling tight and makes a return visit practical if a small correction is ever needed.
If you want city-specific detail, we maintain pages for Cambridge popcorn ceiling removal and Guelph popcorn ceiling removal, and there are two write-ups worth reading alongside this one: a Cambridge-focused cost and process breakdown and a Guelph-focused version of the same.
The full process, step by step
Here's what happens from the moment you call to the moment the last drop cloth comes up. Nothing here is exotic, but the order matters, and shortcuts almost always show up later as cracks, flashing in the paint, or dust in the next room.
Step 1: The assessment
I look at the ceilings in person, or from photos if you want a ballpark first. I'm checking four things: the age of the house, whether the texture is painted, how many rooms and how much square footage, and the ceiling height. I also look for water stains, sagging drywall, and previous patching, because those change the plan.
To find out whether texture has been painted, and with what, I use a simple field test. A cotton swab with rubbing alcohol on an inconspicuous spot will soften and lift latex paint, while oil-base paint will not budge. That matters because the rate depends on it, and because oil-base paint has sealed the texture in a way that makes scraping much harder.
Step 2: The asbestos decision
If your home was built before roughly 1990, or you can't confirm the date the ceiling was finished, a sample goes to an accredited lab before work begins. I cover this in detail further down. Work does not start until the result is back or until we agree the ceiling is clearly newer than the era of concern.
Step 3: Protecting the house
This is the unglamorous part that separates a clean job from a messy one. Floors are covered, furniture is moved out or wrapped in plastic, vents and fixtures are sealed, and doorways to rooms we are not working in are closed off with poly. Light fixtures and fans are taken down or masked. If you can empty a room completely, the job goes faster and cleaner, and we'll talk through what to clear when we book.
Step 4: Removing the texture
On an unpainted popcorn ceiling, the texture is wet down and scraped off. Wetting keeps the dust down and softens the material so the drywall paper underneath is not gouged. On painted ceilings, especially oil-base, the paint has sealed the texture, so it does not soak up water the same way. That's why painted ceilings cost more per square foot: the removal step takes longer and the surface needs more work afterward. We handle the removed material and bag it for disposal.
Step 5: Skim coating
After scraping, no ceiling is smooth enough to paint. There are ridges, tool marks, old screw pops and tape seams. We apply two skim coats of joint compound, letting each coat dry before the next. This is the step where I refuse to rush, and it is the reason a job takes a minimum of two days. Compound needs time to dry. Rush it and you get shrinkage cracks, ghosting and texture that shows through the paint.
Step 6: Sanding
Once the compound is dry, it's sanded to a flat, even finish. Sanding is where the dust control matters most. We use dust containment, and the poly barriers from step 3 are what keep the fine dust out of the rest of your house.
Step 7: Prime and paint
The ceiling gets a coat of primer, then two coats of Sherwin-Williams paint. Primer seals the fresh compound so the paint does not soak in unevenly. Two finish coats give you proper coverage and an even sheen. This is included in the base rate, so you do not get a separate bill for paint.
Step 8: Cleanup and walkthrough
Poly comes down, floors are cleaned, fixtures go back up, and we do a walkthrough together under the lights, with the lights on and the blinds open. I'd rather you spot something while I'm still standing there than discover it three weeks later.
For the full pre-removal checklist, what popcorn ceiling removal costs in Ontario goes through how the estimate is built from these same steps.
Pricing breakdown
All rates below are per square foot of ceiling and are quoted before HST. Ontario HST of 13% is added to the total. "All-inclusive" describes what the work covers, not tax: removal, two skim coats, primer and two coats of Sherwin-Williams paint.
| Service | Rate per sqft (plus HST) | What's covered |
|---|---|---|
| Popcorn removal, unpainted ceiling | $4.50 | Removal, 2 skim coats, primer, 2 coats Sherwin-Williams paint |
| Popcorn removal, latex-painted ceiling | $6.50 | Same scope, extra labour to remove painted texture |
| Popcorn removal, oil-base painted ceiling | $7.50 | Same scope, most labour-intensive removal |
| Skim coat only (smooth ceiling, nothing to bury) | $2.50 | Skim coating without protection prep |
| Skim coat only, full-service with protection | $3.50 | Skim coating with full floor and room protection |
| Skim coat over existing texture (texture stays) | $8.50 | Three coats to bury the texture |
| Ceiling painting only | $50 to $400 per room | Painting of an already smooth ceiling |
| Asbestos testing | $300 to $500 | Lab testing, passed through at cost with no markup |
Why skim coating over texture costs more than removal
This surprises people, so let me be direct. Burying texture is not the cheaper route. At $8.50 per square foot, skim coating over existing texture costs more than removing it, even at the oil-base rate of $7.50. Covering heavy texture takes three full coats of compound to bury it, plus extra sanding, and the result carries the weight of all that compound on your ceiling. I only recommend it in specific situations, such as when scraping is not an option, and I'll tell you if your ceiling is one of them.
What a quote looks like in dollars
Say you have a 500 sqft main floor with an unpainted popcorn ceiling. That's 500 x $4.50 = $2,250 before HST, and $2,250 x 1.13 = $2,542.50 with HST. If the same 500 sqft is latex-painted, it's 500 x $6.50 = $3,250 before HST, or $3,672.50 with HST. If it's oil-base, 500 x $7.50 = $3,750 before HST, or $4,237.50 with HST. Most of the quotes we write are for 400 to 600 sqft of ceiling, which is a main floor, a couple of rooms or a condo. A whole three-bedroom house is a much larger ceiling area, and I'll price that properly in the room-by-room table below.
What's included and what isn't
- Included in the per-square-foot rate: protection and prep, removal, two skim coats, sanding, primer, two coats of Sherwin-Williams paint, cleanup and disposal of the removed texture.
- Billed separately: asbestos lab testing ($300 to $500 at cost) when your home's age calls for it, and HST on the total.
- Not part of this rate: repairs to water-damaged or sagging drywall, which I flag at the assessment so there are no surprises, and wall painting, which is quoted separately.
Factors that affect the price
The rate table gives you the baseline. These are the things that move your final number.
- Painted or unpainted. This is the biggest swing. Moving from $4.50 to $6.50 to $7.50 per square foot reflects real additional labour. Oil-base paint is the hardest to work through.
- Age of the home. Older homes are more likely to need an asbestos test, and in some older houses the drywall behind the texture has seen decades of patching and movement.
- Ceiling height. Standard 8-foot ceilings are straightforward. Vaulted ceilings, stairwells and tall open-concept spaces need scaffolding or staging, which adds time.
- Condition underneath. Water stains, sagging sections, nail pops and previous repairs may need drywall work before skim coating.
- Room count and layout. Many small rooms with lots of corners and cut-ins take longer per square foot than one big open room.
- Access. Furniture left in place, stairs to carry equipment, and condo elevators with booking rules all affect the plan.
- Volume. Larger projects spread the setup and protection time over more ceiling. If you're doing the whole house, tell me, because it changes how I schedule and quote the job.
I'll say plainly what I don't do: I don't invent a discount to win a job and then recover it with add-ons. The number I give you after the assessment is built from the formula above, plus HST.
Asbestos: when to worry, what testing involves, and what happens if it's found
This is the part of the conversation I never want to skip. Asbestos was used in some textured ceiling products and in some joint compounds. Canada banned the manufacture, import and use of asbestos in 2018, but homes built before that, and especially before the 1990s, can still contain it.
When to worry
- Your house was built before roughly 1990, or you are not certain when the ceiling texture was applied.
- The ceiling has been painted over, because that tells you the texture is old but not what's in it.
- You plan to scrape, sand, drill or otherwise disturb the ceiling yourself.
Intact asbestos-containing material that nobody disturbs is generally considered low risk. The hazard comes when the material is broken up and fibres become airborne. That's exactly what scraping and sanding do, which is why the test comes first.
What testing involves
A small sample of the ceiling texture is taken, with the area wetted to keep fibres down, then sealed and sent to an accredited lab. The lab examines it under a microscope and reports whether asbestos is present. Results typically come back in a matter of days, and faster turnaround is sometimes available at extra cost. The price for a test is $300 to $500, and we charge that at cost with no markup. If you want to understand the sampling and lab process in more depth, our complete Ontario guide to asbestos testing before popcorn ceiling removal walks through it, and there's a broader overview of asbestos in older ceilings if you want the background.
A tip from experience: do not scrape a "test patch" yourself to see what's underneath. That is precisely the disturbance the test is meant to prevent.
What happens if asbestos is found
If the result is positive, the job changes. In Ontario, work that disturbs asbestos-containing material falls under specific rules, and the precautions required depend on how the work is classified. That can mean enclosed work areas, specific protective equipment, controlled handling and regulated disposal. It also means costs differ from the standard rates above, and I'll provide a revised scope for that situation rather than quote the standard rate and hope for the best. If a lab comes back positive, I won't pretend the job is the same job. Some homeowners choose to have a specialized abatement contractor handle it, and I'll tell you honestly if that's the right path for your ceiling.
If the result is negative, work proceeds as described in the process section, and the test result gives you a documented record you can keep with your house paperwork.
DIY versus professional
I'm not going to tell you DIY is never reasonable. A small unpainted bedroom in a newer home that has tested negative is a realistic weekend project for a patient person. But most people underestimate it. Here's how the two routes compare.
| Factor | DIY | Professional |
|---|---|---|
| Upfront cost | Lower on paper (materials only) | Higher, priced per square foot |
| Asbestos testing | Still required for older homes | Coordinated for you, passed through at cost |
| Time | Often several weekends for a few rooms | Typically 2 to 3 days for most jobs |
| Tools | Scrapers, sander, poly, tape, mud pans, stilts or scaffold, respirator | Brought and set up by the crew |
| Result quality | Skim coat finish is the hard part to get right | Consistent, repeatable finish |
| Dust and mess | Easy to spread through the house | Containment is part of the job |
| Risk | Gouged drywall, uneven coats, airborne dust | Insured work, one year workmanship warranty |
The hidden DIY costs
- Testing and disposal. You still need the test for an older home, and you are responsible for handling the removed material properly.
- Consumables. Poly sheeting, tape, joint compound, sanding screens, primer and paint add up quickly across multiple rooms.
- Equipment. Staging or stilts, a proper respirator, a dust-extraction sander or a lot of patience with a pole sander.
- Your time. Overhead work is tiring. Skim coating needs drying time between coats, so a rushed weekend turns into a stretched-out month.
- Redo risk. A bad skim coat shows up the moment the light hits it at an angle. Fixing it means sanding and recoating.
The part DIYers most often underestimate is the skim coat, not the scraping. Scraping is rough work, but skim coating a ceiling flat is a skill, and ceilings are unforgiving because every flaw is lit from the side.
How to choose a contractor
You'll get a few quotes, and the cheapest one is not automatically the best deal. Here's how I'd compare them if I were in your shoes.
Questions to ask
- Will you require an asbestos test before starting, and who arranges it? Anyone who waves this off for a 1970s house is a problem.
- What exactly is included in the price? Ask specifically about skim coats, primer and paint, and how many coats of each.
- Do you carry liability insurance and WSIB coverage, and can you show proof? We carry $2M commercial liability insurance and full WSIB coverage.
- How many days will the job take, and why? A credible answer for a typical home is two to three days, because compound needs drying time between coats.
- Who will actually be in my house? Is it the person quoting, or a crew you will meet for the first time on day one?
- What warranty do you give on the workmanship, and what does it cover?
- Is HST included in the number you gave me?
Red flags
- A promise to finish a whole house in a single visit. A proper skim coat cannot be rushed.
- No mention of asbestos for an older home.
- A quote that is a single number with no breakdown of scope.
- Vagueness about insurance or WSIB, or "we'll get you the paperwork later."
- A price far below everyone else's, which often means skipped coats or no paint.
- A suggestion to just skim over the texture as the cheaper option. That costs more, not less.
What a real quote looks like
A real quote states the square footage being assumed, the ceiling type (unpainted, latex or oil-base), the rate per square foot, the scope (removal, two skim coats, primer, two coats of paint), the subtotal, HST and the total. If you can multiply the square footage by the rate and land on the subtotal, you have an honest quote. If the numbers do not tie together, ask why.
If you would like me to look at your ceilings and give you a figure built this way, call me at (519) 729-7394.
ROI and resale value
I'll be careful here, because I've seen inflated claims about return on investment, and I'm not going to quote a percentage I can't back up. What I can tell you from years of working in older homes is how smooth ceilings change how a house shows.
- Photos and first impressions. Listing photos are the first showing. A smooth, freshly painted ceiling reads as clean and maintained. Texture reads as a to-do item.
- Buyer psychology. Buyers mentally price renovations. A textured ceiling often triggers a larger deduction in their heads than the actual cost to fix it, because they don't know about asbestos and imagine the worst.
- A documented negative test helps. If the ceiling has been tested and removed, you can tell buyers it's been dealt with.
- Brighter rooms. Smooth white ceilings bounce light better, which makes rooms look larger and more current.
Payback depends on your situation. If you're selling in the next year, the benefit shows up in how fast and how well the house shows. If you're staying, the benefit is daily: a cleaner look, easier cleaning, and no more dust-catching texture. Here's how one customer put it in a review on our Google listing. Ololade Hassan wrote: "We needed a specialist for popcorn ceiling removal in Cambridge and chose KW Popcorn Ceiling Removal & Painting. They made the process simple, explained everything clearly, and delivered a smooth clean ceiling finish. The before-and-after difference was huge."
Why KW Popcorn Ceiling Removal & Painting
You're not hiring a brand, you're hiring whoever shows up in your home. Here's what that looks like with us.
- Owner-operated. I'm on every job personally. The person who assesses your ceiling is the person doing the work, and that has been true since 2019.
- Experience that's specific to this work. Over 500 KW homes completed since 2019, and ceilings are what we do, not a side service.
- Proper drying time. The minimum job is two days, because skim coats need time to dry. We do not cut that corner.
- Insured and covered. $2M commercial liability insurance and full WSIB coverage.
- Clear pricing. Published rates, shown arithmetic and HST stated up front.
- One year workmanship warranty. If there's an issue with our workmanship within a year, we'll deal with it.
- Local. We're based in Kitchener-Waterloo, and we serve Cambridge, Guelph, Brantford, Woodstock, Hamilton, Burlington, Milton and Oakville.
Another review on our Google listing, from Gary Hines, sums up what I try to deliver: "Eddie is professional and trustworthy always! He worked clean with the best of outcomes."
Neighbourhood spotlight: Cambridge, Guelph and nearby
I'm going to describe housing patterns here in general terms rather than claim specific jobs on specific streets. Home ages and finishes vary block by block, so treat this as a guide to what's likely, not a guarantee.
Galt
Galt is the oldest part of Cambridge, with a mix of 19th-century stone and brick homes, early 20th-century houses, and postwar bungalows and infill. Older houses here often have plaster-and-lath ceilings or have been renovated at various points, so you can find textured ceilings in later additions and updated rooms. Because of the age mix, asbestos testing is especially worth doing in Galt before assuming anything.
Preston
Preston has older streets near the core and postwar housing as you move outward. In homes from the 1950s through the 1980s, textured ceilings are common, and I'd treat any texture from that era as a testing candidate.
Hespeler
Hespeler has an older village core with homes from earlier decades, and subdivisions built through the 1970s, 80s and 90s. The newer a subdivision, the more likely a ceiling is from the later period, which can change the asbestos question, but I never assume. A ceiling finished in the late 80s is still a judgment call, and a test settles it.
Blair
Blair sits along the Grand River and mixes older village homes with newer, larger houses. In the older ones, expect a range of ceiling treatments from various renovations. In newer builds, texture is less likely to be an asbestos concern but may still be painted over multiple times, which affects the rate.
Ainslie Wood
Ainslie Wood is the neighbourhood many people know on the Hamilton side near McMaster, and we serve Hamilton as well. It's a good example of the postwar and later housing where textured ceilings are common and where renters, landlords and owners all share the same streets, which brings the landlord obligations I cover below into play.
Guelph
Guelph has older central neighbourhoods and a wide band of subdivisions from the 1970s onward, so the same logic applies: the older the house, the stronger the case for testing first. Our 2026 Guelph cost and process write-up goes through what to expect locally.
Room-by-room cost table
These figures come straight from the rate table, multiplied by the square footage shown. Each row states the area being assumed so you can check the arithmetic, and the HST column is the pre-HST amount times 1.13. A very small single room often falls under our minimum job size, so a lone bedroom is usually quoted together with other rooms.
| Scenario | Assumed ceiling area | Unpainted ($4.50) before HST / with HST | Latex-painted ($6.50) before HST / with HST | Oil-base ($7.50) before HST / with HST |
|---|---|---|---|---|
| Bedroom | 150 sqft | $675 / $762.75 | $975 / ];,101.75 | ];,125 / ];,271.25 |
| Living room | 250 sqft | ];,125 / ];,271.25 | ];,625 / ];,836.25 | ];,875 / $2,118.75 |
| Main floor (a couple of rooms) | 500 sqft | $2,250 / $2,542.50 | $3,250 / $3,672.50 | $3,750 / $4,237.50 |
| Condo | 600 sqft | $2,700 / $3,051 | $3,900 / $4,407 | $4,500 / $5,085 |
| Finished basement | 700 sqft | $3,150 / $3,559.50 | $4,550 / $5,141.50 | $5,250 / $5,932.50 |
| Whole 3-bedroom house | 1,200 sqft | $5,400 / $6,102 | $7,800 / $8,814 | $9,000 / $0,170 |
The whole-house row assumes 1,200 sqft of ceiling, which falls inside the 900 to 1,500 sqft range typical of a three-bedroom home. At the low end of that range, 900 sqft, the unpainted figure is $4,050 before HST, and at the high end, 1,500 sqft of oil-base is $1,250 before HST. Every number in this post, including the 500 sqft example earlier, comes from the same formula: square footage times rate, then 13% HST.
For comparison, burying the texture instead of removing it costs $8.50 per square foot, so the 1,200 sqft house would be $0,200 before HST. That is more than the oil-base removal figure of $9,000, which is why I steer people toward removal wherever it is possible.
Ontario regulations deep dive
I'm a painter and ceiling specialist, not a lawyer, so treat this section as orientation and confirm specifics with the Ministry of Labour or your own advisor. These are the rules that come up most often in our work.
Regulation 278/05
Ontario Regulation 278/05 deals with asbestos on construction projects and in buildings and repair operations. It sets out how asbestos-containing material must be handled when work could disturb it, and it sorts operations into types based on the level of risk, with more demanding precautions as risk goes up. In practical terms, it's the reason a positive asbestos result changes how a ceiling job must be done, from containment to protective equipment to waste handling.
O. Reg 490/09
O. Reg 490/09 is the Designated Substances regulation under the Occupational Health and Safety Act. Asbestos is one of the designated substances. In general terms, it requires that employers and owners of workplaces and construction projects identify designated substances before work starts and take steps to protect workers. For a contractor, this is why asking about the presence of asbestos before disturbing a ceiling is not optional.
WSIB requirements
Construction businesses in Ontario are generally required to be registered with WSIB and to carry coverage for their workers. For you as a homeowner, the practical point is liability: if an uninsured contractor's worker is injured on your property, the question of who is responsible can become complicated. You can ask any contractor for a WSIB clearance certificate, and you should. We carry full WSIB coverage and $2M commercial liability insurance.
Asbestos disposal rules
Asbestos-containing waste in Ontario is subject to waste management rules. Generally, the material must be kept wet, sealed in heavy-duty bags or containers, labelled, and taken to a facility that is permitted to accept it. It does not belong in your regular household garbage or a standard bin rental. If you are dealing with a positive test, ask whoever is doing the work exactly where and how the waste will be disposed of.
Landlord and condo obligations
If you are a landlord, you have duties around keeping rental units in a good state of repair, and if you or your contractors disturb asbestos-containing material, the same safety rules apply. Tenants should be given proper notice before work, and a documented test result protects everyone. In a condominium, the ceiling slab and drywall finish are often treated differently from the unit's other elements, and the corporation typically has rules on work hours, elevator bookings, noise and insurance certificates for contractors. Check your declaration and rules, and tell me early so I can plan around building requirements.
Project timeline: day by day
The minimum job is two days, and most homes run two to three. Larger houses run three to five. Here's a typical sequence for a mid-sized job, such as a main floor or a condo. Smaller jobs fold some of these steps together within two days, and bigger houses stretch them out.
Before day one: assessment and testing
I assess the ceilings, confirm the ceiling type and area, and give you a quote built from the formula. If your home's age calls for it, the asbestos sample is taken and sent off. We schedule the job once the result is back. This stage happens before any dust is made.
Day one: protection, removal and first skim coat
We cover floors, seal doorways, mask fixtures and set up containment. Texture is wetted and removed. Once the surface is cleared and cleaned up, the first skim coat goes on. By the end of the day, your ceilings look rough and patchy, which is normal and exactly where they should be at this stage.
Day two: second skim coat, sanding and primer
With the first coat dry, the second skim coat goes on. After it dries, the ceiling is sanded flat and wiped down, and primer goes on to seal the compound. On a smaller job, painting may follow the same day once the primer is dry enough; on a larger one, it moves to day three.
Day three: paint and walkthrough
Two coats of Sherwin-Williams paint go on, allowing the proper time between coats. Then we take down the poly, clean the floors, and put fixtures back. We do the final walkthrough together with the lights on and the blinds open so we can look at the ceiling the way you will live with it.
Days four and five: larger homes only
When there is more ceiling area, more rooms or tall spaces that need staging, the same steps run longer. That is why larger homes take three to five days. Timelines also stretch when we find repairs to make under the texture, and I'll tell you as soon as I know.
Another homeowner, Tanya Fleet, left a note on our Google listing about having popcorn ceilings removed in all of her rooms along with the interior painting. We do offer ceiling and interior painting alongside removal, so you can book one visit and have both handled.
Ready to get a straight quote?
If you live in Cambridge, Guelph or anywhere in Kitchener-Waterloo and want to know what your ceilings will actually cost, call or text me at (519) 729-7394. Tell me the age of the house, roughly how many square feet of ceiling you have, and whether the texture is painted. I'll tell you which asbestos steps apply, give you a number you can verify with a calculator, and book you in. Our service area also covers Brantford, Woodstock, Hamilton, Burlington, Milton and Oakville.
Call (519) 729-7394 and ask for Eddie. I'm on every job, and I'm happy to answer questions before you commit to anything.
Eddie — Owner, KW Popcorn Ceiling Removal & Painting
Eddie has personally completed 500+ ceiling removal projects across Kitchener, Waterloo, Cambridge, and Guelph since 2019. Fully licensed, $2M liability insured, and WSIB covered on every job in Ontario.
Ready for a smooth ceiling?
Free quotes for Kitchener-Waterloo, Cambridge, and Guelph homeowners.
Service Area
This guide applies to homeowners in: